Download Print this page

Black & Decker Price Pfister Avalon 48-CB Series Instruction Manual page 4

Lavatory faucet

Advertisement

11
11A
11C
11D
11E
11F
11 POP-UP INSTALLATION
Apply a small bead of putty underneath the Flange (11A) and place a ring of
putty around Drain Opening (11B) of sink. Use PTFE plumber's tape to all
threaded fi ttings according to manufacturer's instructions. Insert Flange (11A)
into Drain Opening (11B). From underneath, insert Rubber Washer (11C) and
Friction Washer (11D) over the bottom of Flange (11A). Thread Locknut (11E)
until Rubber Washer (11C) seats securely inside Drain Opening (11B). Thread
Drain Body (11F) to bottom of Flange (11A). Hand tighten and adjust the Drain
Body so that the Ball Rod Opening (11G) faces the rear. Wrench tighten Locknut
(11E) and wipe excess putty.
12
12A
12F
12D
12 BALLROD INSTALLATION
Drop the Stopper (12A) into the Drain Body (12B) from the top with the Off-Set
(12C) facing rear. From below, insert the Ball Rod (12D) into the Ball Rod Opening
(12E) through the Stopper Hole (12F) and secure with the Nut (12G).
11B
11G
12C
12D
12G
12G
12E
12B
ENGLISH
13
13 POP-UP ROD LINKAGE & ADJUSTMENT
Place one end of Spring Clip (13C) on end of Ball Rod (13B). Insert Ball Rod
(13B) across and through hole in Strap (13D). Secure other end of Spring Clip
(13C). Insert bottom of Lift Rod (13A) into hole at top of Pop-Up Strap (13D).
Tighten with Thumb Screw (13E). Adjust Lift Rod (13A) function by adjusting
location of Thumb Screw (13E) along the Strap (13D) or by adjusting the hole in
which Ball Rod (13B) goes through Strap (13D). Be sure to leave enough space
between Lift Rod Knob (13F) and Spout Hub (13G) when Lift Rod is down.
14
14 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below
the sink.
15
HOT
CLOSED
15 VALVE FUNCTION
COLD valve: close-counterclockwise, open-clockwise; HOT valve: close-
clockwise, open-counterclockwise.
4
13A
13A
13B
FAUCET FUNCTIONS
OPEN
OPEN
13F
13G
13E
13D
13C
COLD
CLOSED

Advertisement

loading