Required Tools
Package Contents
Environmental Requirements
© Copyright 2015 Lenovo
You need the following tools or equipment to install the G8296:
•
Standard flat-blade screwdriver
•
#2 Phillips screwdriver
•
Electrostatic discharge wrist strap
The basic G8296 package contains the following items:
•
One RackSwitch G8296 unit with front-to-rear or rear-to-front airflow
•
One two-post mounting kit for standard 19" equipment racks:
– Two mounting brackets
– Screws to attach brackets to the switch unit
– Screws to attach the switch unit to the equipment rack
•
One console cable kit that includes:
– One Mini-USB to RJ-45 serial cable
– One Category 5 patch cable
– One DB9 to RJ-45 adapter
•
Two AC power cords
•
One Documentation CD, which includes the Systems Information document
•
One Environmental Notices CD
•
One Important Notices document
•
One Warranty Information document
For a list of compatible switch components and options (such as rack-mounting kits,
modules, cords, and cables), see the
This section describes the basic environmental requirements for the G8296. Make
sure the location where you install the switch meets the following requirements:
•
Install the switch unit in a dry, clean, well-ventilated area.
•
Provide adequate space in the front and back of the switch unit, to ensure proper
air flow.
•
Make sure that an adequate grounded power supply is within reach of the switch
unit.
•
Make sure that twisted-pair cable is routed away from power lines, fluorescent
lighting fixtures and other sources of electrical interference.
Lenovo Networking
Catalog.
Chapter 3: Installing G8296 Hardware and Options
31