18.4.4 Run the cable Set Group 4

18.4.4.1 If no extended cables required (24 meters standard length)

1. Lay down the cable set of the 3–Monitor or 4–Monitor suspension.
pulling wire in the duct between monitor suspension and technical area.
2. Place a
pulling wire to the cable set, pull the cable set through the duct.
3. Link the
4. Adjust the cable length at suspension level in order and chack that the suspension bridge is
free to move.
5. Unlink the
NOTE:

18.4.4.2 If cable extension required (24 meters standard too short)

1. Fix the connection box to the wall as shown on the reservation plan.
2. Lay down the cable set of the 3–Monitor or 4–Monitor suspension.
pulling wire in the duct between monitor suspension and connection box.
3. Place a
pulling wire to the cable set, pull the cable set through the duct.
4. Link the
5. Adjust the cable length at suspension level in order and check that the suspension bridge is
free to move.
6. Unlink the
7. Plug the extended cables
connection box and technical area.
NOTE:
Illustration 6-32:
220
pulling wire .
Depending on local regulations, it can be required to put power cables in dedicated
ducts.
pulling wire and connect the cables to the connection box.
to the connection box and place cables in the duct between
It can be required to put power cables in dedicated ducts.
Direction 5160944-13-1EN, Revision 2
18 PIST0017 - System Cable Routing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents