Completing System Setup And Configuration - Lenovo ThinkSystem DM3000x Hardware Installation And Maintenance Manual

Table of Contents

Advertisement

Step 1.
Cable the HA pair with external drive shelves using the following steps:
IOMA
IOM12
First
shelf
IOM12
IOM12
Last
shelf
Step
Perform on each controller
Cable the shelf-to-shelf ports.
1
Connect each controller to IOM A in the stack.
3
Connect each controller to IOM B in the stack
If you have more than one drive shelf stack, see the Installation and Cabling Guide for your drive shelf type.
Step 2.
To complete setting up your system, see

Completing system setup and configuration

You must cable and configure your Windows client before completing your ststem setup and configuration.
Step 1.
Cable and configure your client:
2 2
1
2
3
4
IOM12
LN K
LN K
LN K
LN K
1 1 1
2 2
1
2
3
4
IOM12
LN K
LN K
LN K
LN K
1
2
3
4
IOM12
LN K
LN K
LN K
LN K
IOMB
1
2
3
4
LN K
LN K
LN K
LN K
1
2
3
4
LN K
LN K
LN K
LN K
1
2
3
4
LN K
LN K
LN K
LN K
"Completing system setup and configuration" on page
Chapter 4
Ports used
• Port 3 on IOM A to port 1
on the IOM A on the shelf
directly below.
• Port 3 on IOM B to port 1
on the IOM B on the shelf
directly below.
• Controller 1 port 0b to
IOM A port 3 on last drive
shelf in the stack.
• Controller 2 port 0a to
IOM A port 1 on the first
drive shelf in the stack.
• Controller 1 port 0a to
IOM B port 1 on first drive
shelf in the stack.
• Controller 2 port 0b to
IOM B port 3 on the last
drive shelf in the stack.
.
System installation and setup
23.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem dm5000x7y417y427y577d7w7d7u ... Show all

Table of Contents