Preparing for Installation

Before installing equipment, perform the following steps:
• Move all terminal components, accessories, and cables to the locations
specified in your local site plan.
• Position the cables according to the site plan. Make sure you have the correct
data cable at each terminal location.
• Place the optional equipment next to the terminal to which it will be
connected.
• Remove the shipping tape from those components that have been taped.
4.6.

Determining Power Requirements

This section provides the electrical supply data and main power cable information
to prepare a site for the installation of the TeamPoS 3000 XT terminal. This
product is also designed for IT power systems with phase-to-phase voltage of up
to 240V.
Electrical power to the equipment must comply with all local, state, and national
wiring codes and meet the requirements described here. If you do not have
qualified in-house personnel to ensure that power requirements are met, an
electrical contractor familiar with computer equipment should be hired.
Caution: To prevent data loss, do not plug equipment that can produce
4.7.

General Requirements

1. The safety standards for Information Technology Equipment are only valid if
the building installation conforms to the National Electrical Code for the
country where the equipment is being installed.
2. For equipment that has a pluggable connection to its power source, the power
source outlet must be located near the equipment and must be easily
accessible.
D900000172
sudden surges (i.e., vacuum cleaners) into the power circuit used
by the terminal.
Installation and Maintenance Manual
4-3