Download Print this page

Honeywell 5824 Product Installation Document page 2

Serial/parallel printer interface module

Advertisement

5824 Terminals
B
A
S+
S-
Table 1 5824 to FACP Connections
5 Setting DIP Switches
Each 5824 connected to a compatible FACP requires an ID number
which is set using the DIP switches on the 5824 circuit board. Refer to
the figure below to see how to position the DIP switches for the desired
ID number. See the FACP installation manual for specific information on
device ID assignments. Note that address 0 is invalid and cannot be
used.
ON
OFF
Address
1 2 3 4 5 6
1 2 3 4 5 6
0
1
2
3
4
5
6
7
8
9
10
Figure 3 DIP Switch Settings
6 Connecting to a Printer
Cables are not supplied with the 5824. Use either a pass-through 9-pin
serial cable or a 25-pin Centronics
the printer. Using the appropriate printer cable, connect the cable to the
serial or parallel port on the 5824, and then connect it to the printer.
2
FACP SBUS Terminals
B
A
+
Address
Address
1 2 3 4 5 6
11
22
12
23
13
24
13
25
15
26
16
27
17
28
18
29
19
30
20
31
21
®
parallel cable to connect the 5824 to
5824 Installation Instructions — P/N 151392:G5 2/2/2022

Advertisement

loading