Operation Flow Diagram - Mitsubishi Electric MELSEC iQ-F Series Quick Connection Manual

Hide thumbs Also See for MELSEC iQ-F Series:
Table of Contents

Advertisement

2.4

Operation Flow Diagram

1.
Preparing the required products
(wiring)
3.
Setting the programmable controller
GX Works3
5.
Program examples and checking the operation
When X24 is OFF, the instruction code H0FB is sent at the rising edge of X25 and the operation mode is changed to 2 (PU mode).
X25
X24
MOV
H0FB
D280
Operation
Operation
Instruction code
mode
mode
write
read
MOV
K2
D281
Operation mode
SET
M280
Execution
command
ExecuteCommandCode FB of the station number 1: Sending the instruction code to the station number 1
M_INVERTER_CC_IEF_Basic_ExecuteCommandCode_F_00A_1
ExecuteCommandCode
M290
M280
B:i_bEN
o_bENO:B
Execution command
Execution command
Execution status
Execution status
M291
D0
W:i_wStationNo
o_bOK:B
Station number
Station number
Normal end
Normal end
M292
D280
W:i_wCommandCode
o_bErr:B
Instruction code
Instruction code
Failed end
Failed end
D281
W:i_wWriteValue
o_wErrID:W
D290
Write value
Error code
Error code
Write value
o_wResultData:W
D291
Executing result
Executing result
M291
RST
M280
Normal end
Execution
command
END
2.
Setting the IAI controllers
Predefined Protocol Support Tool
For Positioning
4.
Checking the communication
status
2 PREPARATION
2.4 Operation Flow Diagram
2
14

Advertisement

Table of Contents
loading

Table of Contents