PRE-INSTALLATION

• Ensure that the unit is installed in compliance with all building codes and/or regulations.
• The unit must be mounted on a flat vertical wall capable of supporting the full weight of the unit.
• Use fixings as specified in this installation guide.
• Ensure no pipe work (gas, water, air) or electrical cables, wires or ductwork are located directly behind
the drilling/mounting area.
• All metal parts in contact with this unit MUST be grounded
• Do not use sealant when fixing the unit to the wall.

INSTALLATION

This hand dryer provides maximum flexibility when installing the hand dryer. Installation is available
using the supplied power cable or by hard-wire installation.
Check local and general regulations before installing the hand dryer. Ensure that the electrical
network is not overloaded. Do not connect to a branch circuit rated less than the amperage of this
hand dryer.
A. Installation Instructions – Using supplied Power Cable
A 2.1m (6.9ft) power cable is supplied with this unit. When choosing to use the supplied power cable,
proceed as outlined below.
1. Use the supplied Allen key and carefully remove the stainless steel hand dryer cover. Pull the stainless
steel cover upwards to remove as shown in Figure 1.
2. Connect the supplied power cable to the terminal block (a) the negative cable to the negative terminal
(labeled N). (b). the ground cable to the ground terminal and (c). the positive cable to the positive
terminal (labeled L). as shown in Figure 2.
1
2
5