NETGEAR ReadyNAS 4200 Hardware Manual page 10

Hide thumbs Also See for ReadyNAS 4200:
Table of Contents

Advertisement

Use the provided mounting screws to mount the inner rails to the system chassis.
2.
Fasten the backs of the outer rails to the rack with screws. Press the release to extend the
3.
rails. Hang the hooks of the rails into the rack holes, and fasten the rails to the rack.
Attach chassis to the rack.
4.
a. Extend the ball shuttle (A) to the very front.
b. Align the rails (B) and push the chassis in.
c. Secure the handles to the outer rails (C) with screws.
The rack mount installation is complete.
10 |
Chapter 1: Getting Started
ReadyNAS 4200 Hardware Manual

Advertisement

Table of Contents
loading

Table of Contents