Rack-Mounting The Switch - Cisco Catalyst 4900 Series Installation Manual

Cisco systems switch installation guide
Hide thumbs Also See for Catalyst 4900 Series:
Table of Contents

Advertisement

Rack-Mounting the Switch

Step 1
Step 2
Rack-Mounting the Switch
Caution
Caution
Catalyst 4900 Series Switch Installation Guide
3-2
To verify the contents of the shipping container follow these steps:
Compare the contents of the accessories kit to the packing slip. Verify that you
received all listed equipment, which should include the following:
Switch hardware and software documentation, if ordered
Optional equipment that you ordered, such as network interface cables,
transceivers, or special connectors
To begin installation, proceed to the
page
3-2.
A standard rack-mount kit is included for mounting the switch in a standard
19-inch (48.3 cm) equipment rack. A standard equipment rack has two
unobstructed outer posts, a minimum depth between the front and rear mounting
posts of 19.25 inches (48.9 cm), and a maximum depth of 32 inches (81.3 cm).
This kit is not suitable for racks with obstructions (such as a power strip) that
could impair access to the switch.
Before installing the chassis in a rack, read the
Requirements" section on page 2-1
environmental conditions. Failure to read and follow these guidelines could lead
to an unsuccessful installation and possible damage to the system and
components.
This unit is meant to be rack-mounted, and is not intended to bear more than its
own weight. Do not stack more than two on a table top, the added weight may
damage the bottom chassis.
Chapter 3
"Rack-Mounting the Switch" section on
"Site Environmental
to familiarize yourself with the proper site and
Installing the Switch
78-18039-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents