Cisco UBR10012 Quick Start Manual page 41

Cisco systems universal broadband router installation guide
Table of Contents

Advertisement

To install the AC PEM module on the Cisco uBR10012 router:
Verify that the power switch on the AC PEM is in the Standby (0) position.
Step 1
Do not connect power to the AC power sources or apply power to the chassis. This is done as part of the
Caution
system startup after all connections are made.
Position the AC PEM in the power bay and slide it all the way in, and ensure that it makes a secure
Step 2
connection with the chassis backplane.
Tighten the captive screws to secure the AC PEM using a screwdriver.
Step 3
To tighten the captive screws on the AC PEM modules, the installation torque used should be 8 in-lbs.
Note
Plug the AC-input power cables into the power receptacles on the front of the AC PEM.
Step 4
If you are using the UBR10-PWR-AC-PLUS= module, then the two AC power cables must be installed
Note
on each PEM module for the PEM to operate.
Repeat
Step 5
Route the AC power cables on the AC PEM modules.
Step 6
Note
OL-24972-01
Step 1
to
Step 4
to connect the second AC PEM module.
UBR10-PWR-AC= module—Route the power cables up at the front of the AC PEM module and
clip it into the two retaining clips. The power cables go out through the notch on the right side
of the front cover when it is installed.
UBR10-PWR-AC-PLUS= module—Route the power cables down to the front of the AC PEM
module and clip it down into the three retaining clips. (See
Ensure that you lift the handles and route the cables underneath the handles and through the
power cord clips of the UBR10-PWR-AC-PLUS= AC PEM modules as shown in
that the front cover fits on the Cisco uBR10012 chassis.
Cisco uBR10012 Series Universal Broadband Router–Quick Start Guide
Installing the Chassis
Figure
21.)
Figure 21
so
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ubr10012 series

Table of Contents