Method Of Procedure; Unpacking And Checking The Contents Of Your Shipment - Cisco MWR 1941-DC-A Hardware Installation Manual

Cisco systems mobile wireless edge router hardware installation guide
Hide thumbs Also See for MWR 1941-DC-A:
Table of Contents

Advertisement

Site Planning

Method of Procedure

As described previously, part of your preparation includes reviewing installation plans or MOPs. An
example of a MOP (pre-installation checklist of tasks and considerations that needs to be addressed and
agreed upon before proceeding with the installation) is as follows:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Unpacking and Checking the Contents of your Shipment

The shipping package for the Cisco MWR 1941-DC-A router is designed to reduce the possibility of
product damage associated with routine material handling experienced during shipment. To reduce the
potential damage to the product, transport the Cisco MWR 1941-DC-A router in its Cisco-specified
packaging. Failure to do so may result in damage to the Cisco MWR 1941-DC-A router. Also do not
remove the Cisco MWR 1941-DC-A router from its shipping container until you are ready to install it.
Note
Do not discard the packaging materials used in shipping your Cisco MWR 1941-DC-A router. You will
need the packaging materials in the future if you move or ship your Cisco MWR 1941-DC-A router.
The Cisco MWR 1941-DC-A router, cables, and any optional equipment you ordered may be shipped in
more than one container. When you unpack the containers, check the packing list to ensure that you
received all the following items:
Cisco MWR 1941-DC-A Mobile Wireless Edge Router Hardware Installation Guide
2-6
Assign personnel.
Determine protection requirements for personnel, equipment, and tools.
Evaluate potential hazards that may affect service.
Schedule time for installation.
Determine any space requirements.
Determine any power requirements.
Identify any required procedures or tests.
On an equipment plan, make a preliminary decision that locates each Cisco MWR 1941-DC-A
router that you plan to install.
Read this hardware installation guide.
Verify the list of replaceable parts for installation (screws, bolts, washers, and so on) so that the parts
are identified.
Check the required tools list to make sure the necessary tools and test equipment are available (see
the
"Required Tools and Equipment" section on page
Perform the installation.
Router
Black 3-pin power terminal block connector (Phoenix part number 1756272) located in the
accessory kit that shipped with your router
Rack-mount bracket kit (if not installed at factory); includes rack-mount brackets (2) and #8-32 x
0.37-inch flat pan-head screws (7) includes 1 spare
The Documentation DVD, as specified in your order
Cisco Information Packet publication
Chapter 2
Preparing to Install the Router
2-7).
OL-7872-04

Advertisement

Table of Contents
loading

Table of Contents