Black & Decker Price Pfister Portland 42-P Series Instruction Sheet page 3

Single control lavatory faucet
Table of Contents

Advertisement

Available languages

Available languages

7
7C
7A
7D
7B
7 SECURING FAUCET
From underneath sink, secure the faucet by placing the Channel Washers (7A)
and the Nuts (7B) onto Mounting Posts (7C). Tighten Nuts (7B) until the faucet is
fi rmly connected to the sink. For thin deck installations, use the support Sleeves
(7D) in addition to the Channel Washers.
Caution: Do not over tighten!
8
8B
8A
HOT
8 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (8A) to Faucet Inlets (8B). Hot water supply lines go
into left inlet. Cold water supply lines go into right inlet. (Supply lines not included).
Please follow manufacturer's instructions when installing suppy lines.
ENGLISH
7C
7A
7D
7B
8B
8A
COLD
3
9
9 POP-UP ROD CONNECTION
Insert Lift Rod (9A) into hole at the back of Spout (9B).
DRAIN BODY INSTALLATION
10
10A
10 POP-UP INSTALLATION
Install and adjust Pop-Up (10A) using separate instructions supplied with the
Pop-Up assembly.
11
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the
sink.
9A
9B

Advertisement

Table of Contents
loading

Table of Contents