Led Indicators; Wall Mount - Honeywell E-Mon E10039 Installation And Setup Manual

Table of Contents

Advertisement

LED INDICATORS

E10039 NPort Express's top panel contains five LED indicators, as described in the following table.
LED Name
PWR
Red
Off
Link
Orange
Off
Ready
Green
Blinking
Off
Serial Tx
Green
Off
Serial Rx
Orange
Off

WALL MOUNT

For many industrial applications, you will find it convenient to mount NPort Express on the wall, using two screws, as
indicated below.
1. Screw two screws, separated by 7.8 cm, into the wall. The heads of the screws should be no greater than 6.5 mm in
diameter, and the shafts should be no greater than 3 mm in diameter. Do no screw the screws in all the way. Leave a
space of about 2 mm to allow room for sliding the NPort Express unit's ears between the wall and the screws.
LED Color
Power is on.
Power is off, or power error condition exists.
10 Mbps Ethernet connection.
Ethernet cable is disconnected, or has a short.
NPort Server systen us ready.
NPort is requesting an IP address from the DHCP or BootP server. After
receiving the IP, the LED will stop blinking.
Note: The LED will also blink when you press the reset button; see page 1-5 for
details.
NPort Server has malfunctioned.
Serial data is being transmitted.
Serial data is not being transmitted.
Serial data is being received.
Serial data is not being received.
Table 1.
LED Function
← →
Fig. 3.
5
EKM-E ETHER-MON KEY DE-211
31-00160—01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nport express de-211

Table of Contents