Before Operation; Installing The Battery Pack - Toro Flex Force Power System 60V MAX 22in Recycler Operator's Manual

Table of Contents

Advertisement

Operation

Before Operation

Installing the Battery Pack

Important:
Operate the battery pack only in temperatures that are within the appropriate range; refer
to
Specifications (page
1.
Make sure that the vents on the battery are clear of any dust and debris.
2.
Lift up the battery-compartment lid (A of
3.
Line up the cavity in the battery pack with the tongue on the machine and slide the battery pack into the
compartment until it locks into place (B of
4.
Close the battery-compartment lid (C of
11).
Figure
Figure
8).
Figure
8).
8).
Figure 8
12
g251221

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2036320363t2036620366t

Table of Contents