After Switch Installation; Installing The Power Cord Retainer (Optional) - Cisco Catalyst 2960-L Smart Managed Series Hardware Installation Manual

Smart managed 24-portand 48-port switch
Hide thumbs Also See for Catalyst 2960-L Smart Managed Series:
Table of Contents

Advertisement

After Switch Installation

3. Place the switch on the table or shelf near an AC power source.
4. When you complete the switch installation, see
switch configuration.
DETAILED STEPS
Step 1
To install the switch on a table or shelf, locate the adhesive strip with the rubber feet in the mounting-kit envelope.
Step 2
Attach the four rubber feet to the four circular etches on the bottom of the chassis.
Step 3
Place the switch on the table or shelf near an AC power source.
Step 4
When you complete the switch installation, see
configuration.
After Switch Installation
• Configure the switch using the Configuration Setup wizard to enter the initial switch configuration.
• Install the power cord retainer (optional).
• Connect to the front-panel ports.

Installing the Power Cord Retainer (Optional)

The power cord retainer is optional (part number [PWR-CLP=]). You can order it when you order your switch,
or you can order it later from your Cisco representative.
SUMMARY STEPS
1. Choose the sleeve size of the power cord retainer based on the thickness of the cord. The smaller sleeve
can be snapped off and used for thin cords.
2. Slide the retainer around the AC power cord, and pass it around the loop on the switch.
3. Slide the retainer through the first latch.
4. Slide the retainer through the other latches to lock it.
5. (Optional) Use the small sleeve for thin power cords. Use the small sleeve to provide greater stability for
thin cords. Detach the sleeve, and slide it over the power cord.
6. Secure the AC power cord by pressing on the retainer.
DETAILED STEPS
Step 1
Choose the sleeve size of the power cord retainer based on the thickness of the cord. The smaller sleeve can be snapped
off and used for thin cords.
Step 2
Slide the retainer around the AC power cord, and pass it around the loop on the switch.
Cisco Catalyst 2960-L Smart Managed Series 24-Port and 48-Port Switch Hardware Installation Guide
24
After Switch Installation, on page
After Switch Installation, on page
Switch Installation
24for information on
24for information on switch

Advertisement

Table of Contents
loading

Table of Contents