On integral mount design devices, the terminals are located
behind the cover on the rear of the transmitter housing.
A schematic electrical connection diagram can be found on
the inside of the cover. The configuration of the device is
marked here.
Fig. 17: Terminals
1 Cover for connection area | 2 Pin assignment |
3 Cable entry points | 4 Terminals for power supply |
5 Terminals for signal inputs and signal outputs | 6 Terminal cover
IMPORTANT (NOTE)
Use suitable wire end sleeves when connecting
the cables.
Connect the device:
1. Unscrew the cover for the connection area.
2. Prepare the cable ends and feed them into the connection
area through the cable entry points.
3. Remove the terminal cover and connect the power supply
cables as shown in the connection diagrams.
4. Replace the terminal cover.
5. Connect the signal input and output cables as shown in
the connection diagrams. Connect the cable shielding (if
used) to the designated grounding clamp.
6. Unscrew the cover for the connection area again.
NOTICE – Potentially adverse effect on
housing ingress protection
If the gasket (o-ring) is seated incorrectly or
damaged, this may have an adverse effect on the
housing ingress protection.
Before closing the housing cover, check the
gasket (o-ring) for any damage and replace if
necessary. Check that the gasket is properly
seated when closing the housing cover.