Installing The Main Ksu; Before Installing The Ksus; General Precautions; Unpacking - NEC Xen Topaz System Hardware Manual

Hide thumbs Also See for Xen Topaz:
Table of Contents

Advertisement

Installing the Main KSU

S
1
E C T I O N
B
I
EFORE
NSTALLING
KSU
THE
S
System Hardware Manual

1.1 General Precautions

To avoid shock or damage, do not plug in or turn the system power
on before completing the installation process.
Avoid working with the KSU during electrical storms.
Use only commercial AC power to prevent shock or fire.
Use the power cord supplied for the KSU.
Do not bundle AC Power cords together, the cords may over heat.
Make sure the KSU has proper Earth ground connected to the
earth terminal.

1.2 Unpacking

Unpack the KSU and check it against the following list. Inspect for
physical damage.
Items
924M KSU

1.3 Preparations

Make sure the necessary tools (Screw Driver Set, Pliers Set, etc)
are propertied.
Make sure you have a building plan showing common equipment,
extensions, the telecom demarcation, and earth ground location.
The installation site must meet the following Site / Environmental
Requirements.

1.4 Site Requirements

The system should be wall-mounted only. Ensure that enough
space is available to allow the installation of KSUs and/or OPBOX.
A dedicated 110/240VAC circuit located within 2 meters of the KSU
is required. A separate dedicated AC outlet is necessary for each
KSU.

1.5 Environmental Requirements

Meeting established environmental standards maximizes the life of the
system. Be sure that the site is not :
List of Contnets
924M KSU
AC Power Cord
Screws (M4.1x25)
Template for Wall Mounting
Chapter 4
QTY
1
1
4
1
- 21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents