Installing The Cable-Management Bracket - Cisco 7513 Series Replacement Instructions Manual

Chassis replacement
Hide thumbs Also See for 7513 Series:
Table of Contents

Advertisement

Replacing the Chassis

Installing the Cable-Management Bracket

Once you have rack-mounted the new chassis, follow these steps to install the cable-management
bracket:
Step 1
Step 2
Figure 6
Blower
module
Loosen
screws (2)
Bracket
Card cage
Step 3
Step 4
This completes the procedure for installing the cable-management bracket.
Proceed to the next section for the procedure for removing processor modules.
12 Cisco 7513 Chassis Replacement Instructions
At the interface processor end of the router, place the bracket above the card cage opening
and align the holes in the bracket with the holes in the chassis.
Insert the screws through the bracket and into the chassis. (See Figure 6.)
cable-Management Bracket
When both screws are inserted, use a flat-blade screwdriver to tighten them.
When installing the network interface cables, route the cables to the cable-management
bracket, as shown in Figure 6. If you are using very thin cables that slip through the bracket
openings, insert cable ties through the holes in the bracket and wrap them around the cables
to secure them.
It might be necessary to bundle longer cables to avoid tangling them. Do this at the
cable-management bracket or at the rack, but leave enough room to be able to remove
processor modules and change cables as required. Also, do no block the power supply air
vents with cables.