Step 6: Wire The Sem To The Vista Panel - Honeywell ADEMCO VISTA 10P Installation Manual

Table of Contents

Advertisement

STEP 6: WIRE THE SEM TO THE VISTA PANEL

Verify panel AC Power is removed and
the backup battery is disconnected.
SEM
+12V
YELLOW
(IN)
GREEN
(OUT)
GND
Connect panel terminal 4 (GND) to SEM GND.
Connect panel terminal 6
to
GREEN
(OUT).
Connect panel terminal 7
to
YELLOW
(IN).
Use the included red cable with the two prong battery connector
to connect the battery to both the SEM and the panel. For a power-
limited circuit, ensure the fuse is inside the VISTA panel.
Once wiring is complete, route the antenna(s) outside of the enclosure,
away from the SEM, and replace the enclosure cover. Please note that
the antenna(s) should be routed through the second and third channel
openings at the top of the enclosure (see zoom view below).
CDMA/HSPA
Modules
(GREEN: DATA IN FROM
(YELLOW: KEYPAD DATA
LTE Modules
12V Battery
4
GND
5
+12V
6
GREEN (DATA
7
YELLOW (DATA
VISTA Panel
KEYPAD)
OUT)
IN)
OUT)
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ademco vista 15pAdemco vista 20p

Table of Contents