Step 7: Power Up The Panel - Honeywell ADEMCO VISTA 10P Installation Manual

Table of Contents

Advertisement

DUAL PATH (OPTIONAL)
For Broadband Ethernet,
connect the provided Ethernet
Dongle to the connector on the SEM.
Connect the Ethernet cable to the
provided Ethernet Dongle.

STEP 7: POWER UP THE PANEL

Connect the backup battery and restore AC power to the panel.
For the SEM to interact with the existing zones on the system, it must
read them from the VISTA panel. The SEM will do a "zone scan" to read
this information.
Additionally, the SEM will automatically set the panel settings needed
for the SEM to communicate. These settings can be found on page 15.
The zone scan will automatically begin after the panel is powered up.
On the keypad you will see a series of disarms and programming setting
changes before seeing "MODEM COMM" on the screen.
Ready to Arm
When the zone scan is complete the keypad will display the home screen.
This process will take less than 3 minutes.
Now that the zone scan is complete, the Equipment list should be updated
on the Partner Portal and the Installer and Master User codes should be
synced with the SEM.
If you do not see the MODEM COMM message appear on the
keypad during zone scan and instead notice the keypad scrolling
through each zone individually, the SEM is using an alternate
zone scan method. Wait for the SEM to finish scanning and
leave programming before interacting with the panel. Resync
the panel master code with the SEM by changing the Master
Code at the panel or through the Customer Website.
10
ZONE SCAN
~3 minutes
Do not touch the panel or keypad.
ZONE SCAN
COMPLETE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ademco vista 15pAdemco vista 20p

Table of Contents