Step 6: The control of maintained or non-maintained operation of the luminary is achieved through Switch 4 on
DS1. For maintained operation, switch number 4 must be in ON position. For non-maintained operation,
switch number 4 must be in OFF position.
Step 7: Install the included cable tie (if needed) to fasten securely the power cables.
Step 8: Place the battery connector to the corresponding connector on the PCB.
Step 9: Refit carefully the removed plastic parts. If the luminaire will be used for maintained operation, see
chapter "Pictogram installation" below. Finally place the diffusor. Attention! The 6 plastic latches (A) must
all be secured (click sound). This requirement is important to ensure the IP65 rating. Power on the
luminaire.
Step 1: Place a flat blade screwdriver and pull up gently the diffusor clips from both sides to remove the diffusor.
Step 2: Install the pictogram you need in the diffusor and refit it to the luminary.
(In case you need to change the pictogram follow the same procedure).
Step 3: Fill in the letter G on the specification label.
Note:
In case of battery replacement, this must be replaced with parts of the same type and characteristics.
The replacement must be performed by the manufacturer or a competent person.
Note:
The light source is non-replaceable.
Note:
If the supply cable of the luminaire is damaged, it shall exclusively be replaced by a competent person
in order to avoid hazard.
Important notice when installing luminaires within the
same area!
To avoid that luminaires perform their battery test at the
same day, connect the battery packs with more than 1,5
minutes inbetween.