Huawei OceanStor N8500 T Series Installation Manual page 182

Clustered nas storage system
Table of Contents

Advertisement

OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
l
l
l
l
Precaution
Stacking storage devices will damage devices; therefore, storage devices must be placed on
adjustable guide rails.
Context
l
l
l
l
Procedure
Step 1 Install the left adjustable guide rail (with an L identifier).
Issue 02 (2015-09-22)
Marker pen
M6 screws
Square-hole positioning pin (matching square holes on channels)
Round-hole positioning pins (matching round holes on channels)
NOTICE
Each SUC is configured with a pair of adjustable guide rails.
Guide rails can be flexibly adjusted from 600 mm to 900 mm, and installed in the cabinet
with a depth from 800 mm to 1200 mm.
Adjustable guide rails come preinstalled with square-hole positioning pins. If required,
change square-hole positioning pins to round-hole ones before installing adjustable guide
rails.
NOTE
You can find the round-hole positioning pins in the accessory bag delivered with storage devices.
Four M6 screws are used to secure the adjustable guide rails.
installation positions of the M6 screws.
Figure 7-5 Securing adjustable guide rails
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 N8500 Installation (with S5600T, S5800T or S6800T
Storage System as the Storage Unit)
Figure 7-5
shows the
173

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oceanstor n8500 v200r002Oceanstor n8500 v100r005

Table of Contents