Final Checks And Trial Operation; Temperature Range For Using And Installing The Product - Samsung AN026JSKLKN Series Installation Manual

Erv, energy recovery ventilator
Hide thumbs Also See for AN026JSKLKN Series:
Table of Contents

Advertisement

final Checks and trial operation

final checklist
Check the follows after the installation .
f Installation location and its strength
f
f Inspection hole installation
f
f Wiring
f
f Insulation
f
Check the operating condition and damper operation .
Setup the ERV wired remote controller
function
Heat-EX mode
By-Pass mode
f If an error occurs during trial operation, check out the wiring . Turn off the sub power supply and carry out the wiring work
f
again .
f after the trial operation, explain how to use the ERV to the user and hand over the product with the user's manual .
f

temperature range for using and installing the product

Install condition
0~40 °C, 80 % RH below
Air volume
Check the airflow from outdoor
Turbo, High, low
air suction duct and air outlet is
Turbo, High, low
controlled by Turbo, High, low .
outdoor air condition
-15~50 °C, 80 % RH below
ENGLISH-31
Checks
operating condition
damper operation
located on the corner (Open)
located on side (Closed)
Indoor air condition
0~40 °C, 80 % RH below

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents