Commisioning - Samsung MCU-R4NEK0N Installation Manual

Hr changer
Table of Contents

Advertisement

Commisioning

to complete it.
1. If the gas leaking test has been completed or not.
4. If the R-410A refrigerant has been charged or not.
If the subsidiary unit for R-410A has been used or not.
6. If the HR Changer frame has been installed upside-down or not.
7.
If the wire earthing work has been done or not.
8. If the space between sidewalls, ceiling concrete, and the ceiling Tex has been secured enough or
not to install the HR Changer frame.
10. If the prescribed wire has been used or not.
11. If the supplied power is proper or not.
12. If the additional refrigerant is proper or not.
(Refer to the installation manual of the HR outdoor unit.)
30 English
Item
Check

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents