8.
Using two screws, secure the Base and Expansion chassis
together with the metal reinforcement bracket provided.

Figure 3-34 Installing Reinforcement Bracket

3.5.2
Installing Expansion Blades in the 9.5" Base and Expansion Chassis
(Optional)
When adding additional chassis to the system to expand the
capacity, a PZ-BS10 must be installed in the Controlling Chassis and
a PZ-BS11 must be installed in all Expansion Chassis. This
connection is required with any multiple-chassis setup.
The PZ-BS10 connects the Controlling Chassis to the Expansion
Chassis by connecting to a PZ-BS11, which is installed on each
Expansion Chassis. These Expansion Interface Units allow the CPU
to transmit/receive data as required to the additional chassis.
The PZ-BS10 is installed in the Expansion bay of the Controlling
Chassis which is equipped with a CPU blade. The PZ-BS11 is
installed in the Expansion bay of the Expansion Chassis, which does
not have a CPU.