Page 2
! WARNING This manual is intended for qualified service personnel only. To reduce the risk of electric shock, fire or injury, do not perform any servicing other than that contained in the operating instructions unless you are qualified to do so. Refer all servicing to qualified service personnel.
Page 3
Attention-when the product is installed in Rack: 1. Prevention against overloading of branch circuit When this product is installed in a rack and is supplied power from an outlet on the rack, please make sure that the rack does not overload the supply circuit.
Contents DVS-9000/9000SF Manual Structure This manual is the installation manual of Switcher Processor Pack DVS-9000-C/ DVS9000SF-C and their optional boards and units. This manual is intended for use by trained system and service engineers, and describes the information on installing the DVS-9000-C/DVS9000SF-C system.
. Areas subject to electrical noise. . Areas subject where is subjected to static electricity. Ventilation The inside of the DVS-9000-C/DVS9000SF-C (DVS-9000 series hereafter) is cooled by a fan (both sides). The power supply can be damaged if the exhaust vent (both sides) and air intake (front panel) are blocked or the fan is stopped.
1-3. Installation Space (External dimensions) 1-3. Installation Space (External dimensions) 1-3-1. DVS-9000 144.5 115.5 115.5 Unit : mm DVS-9000/9000SF...
1-4. Installing the Options 1-4. Installing the Options The DVS-9000-C/DVS9000SF-C is shipped from the factory with the necessary option boards (refer to the following table) already installed in accordance with the specified system configuration. The following options are available for the DVS-9000/ 9000SF.
Page 13
Installation Procedure 1. Turn off the main power of the DVS-9000/9000SF and disconnect the AC power cord from the wall outlet. 2. Loosen the four screws (with drop-safe) and remove the front panel to the arrow. Screws (with drop-safe) Front panel Screws (with drop-safe) (The illustration shows the DVS-9000.) 3.
1-4. Installing the Options 5. While closing the eject levers in the direction of arrow 1, push in the plug-in board. Eject lever Eject lever (The illustration shows the DVS-9000.) 6. Attach the plug-in board loose-proof assembly and the front panel by reversing the installation steps of 2, 3. DVS-9000 option Name of option Name of board...
2. Insert the connector board horizontally level and secure it with the two fixing screws. Screws (with drop-safe) (The illustration shows the DVS-9000.) DVS-9000 option Name of option Name of board BKDS-9160 CNO-19 board BKDS-9161 CNO-20 board MKS-8110SD CNI-10 board MKS-8111SD CNI-17 board DVS-9000SF option...
1-4. Installing the Options 1-5. Rack Mounting 4. Push the portion of the HK-PSU04 marked by the arrow and insert the HK-PSU04 into deep end as far as it will go. 5. Secure the HK-PSU04 with the two screws removed in step 3.
Page 17
2. Rack Mounting Procedure This section describes the rack mounting procedure using the RMM-10 rack mount kit. Tighten the screws to the following torque. Tightening torque : 120 x 10 N.m {12.2 kgf.cm} 1. Attach the rack tool to the side of the equipment using the specified six screws.
Page 18
1-5. Rack Mounting 6. Align the groove of the rack tool at the side of the equipment with the rail, and slide the equipment to the rear. The rack tools are hooked on the rails as shown below. Rack tool Rail 7.
1-7. Input/Output Signals of Connectors 1-7. Input/Output Signals of Connectors The input/output signals of the connectors at the rear panel are as follows. TERMINAL : RS-232C (D-sub 9-pin, Female) to Terminal _ EXT VIEW _ Pin No. Signal Name Function Data Carrier detect Received data Transmitted data...
Page 21
REMOTE 1 to 4 : RS-422A (D-sub 9-pin, Female) <DEVICE> (*5) from External Devices _ EXT VIEW _ Pin No. Signal Name Function Frame ground Transmitted data (_) Received data (+) Common ground No Connection Common ground Transmitted data (+) Received data (_) No Connection (*5) <DEVICE>...
1-8. Checks on Completion of Installation 1-8. Checks on Completion of Installation 1-8-1. Description of On-board Switches and LEDs The number shown in the parentheses ( ) indicated the address on the circuit board. 1. CA-44 board (DVS-9000/9000SF) TP1002 TP1003 TP1001 S302 S301...
Page 23
D802 (A-2) : COM2 100 status LED COM CPU-2 Ethernet communication speed status indication. Lit : 100 Mb/s Not lit : 10 Mb/s D901 (A-2) : REF EXT status LED REF IN signal presence/absence status indication. Lit when the REF signal is input to the REF IN connector. Not lit when the REF signal is not input to the REF IN connector.
Page 24
1-8. Checks on Completion of Installation CN503 (A-5) : TERMINAL pin This pin is connected to the COM CPU-1 control terminal and used during maintenance. Conforms to RS-232C. CN703 (A-5) : TERMINAL pin This pin is connected to the COM CPU-2 control terminal and used during maintenance.
Page 25
1-8. Checks on Completion of Installation DI3 (F-3), DI6 (F-3), DI7 (F-3), DI8 (F-4) (green) : STATUS1 to STATUS4 LED Used for maintenance purpose. Only the STATUS1 LED is lit in normal operation. DI4 (green) (B-5) : + + + + + 3.3 V Indicates the status of the VCC (CORE) and VCC (I/O) powers that are supplied to the CPU-DK module.
Page 27
<Switch> S301 (A-8) : MIX-CPU reset switch Pressing this switch initializes the CPU on the MIX-46 board. S2031 (A-9) : Monitor reset switch The reset switch that is used to reset the monitor during maintenance through the terminal. <Slit land> SL1, SL2 (G-9) and SL3 (B-6) : JTAG chain switching They are the slit lands that are used to switch the JTAG chains.
Page 28
1-8. Checks on Completion of Installation 3. MY-108 board (DVS-9000/9000SF) E106 TP104 D114 TP103 D113 TP101 D104 TP102 D103 E100 SL700 SL701 SL702 CN700 E104 CN401 S100 TP400 S400 D702 D703 D704 D700 D200 D701 E102 <LED> D103, D107 (A-4) : + + + + + 1.8 V-1 and 2 +1.8 V-1 and 2 power supply status indication.
Page 29
S400 (A-9) : MONITOR reset switch The reset switch that is used to reset the monitor during maintenance through the terminal. <Slit land> SL700, SL701 (A-5), SL702 (A-6) :JTAG Chain switching They are the slit lands that are used to switch the JTAG chains.
Page 30
1-8. Checks on Completion of Installation 4. OUT-26 board (DVS-9000/9000SF/BKDS-9160) TP201 D207 TP200 D203 TP100 D103 TP101 D107 CN1700 SL1701 SL1700 SL1702 CN900 S200 S800 D1005 D1004 D1003 D1001 D1002 D1000 <LED> D103, D107 (A-4) : + + + + + 1.8 V-1 and 2 +1.8 V-1 and 2 power supply status indication.
Page 31
S800 (A-10) : MONITOR reset switch The reset switch that is used to reset the monitor during maintenance through the terminal. <Slit land> SL1700 (C-6), SL1701 (C-6), SL1702 (C-6) : JTAG Chain switching They are the slit lands that are used to switch the JTAG chains.
Page 32
1-8. Checks on Completion of Installation 5. XPT-21 board (DVS-9000/9000SF) CN3301 D3401 CN3303 CN3001 S3401 S3301 CPU-DR CN3901 Module (MAIN CPU) <LED> D3401 (A-5) : RESET status LED System reset status indication. Lit when S3401 is pressed or the power voltage drops to +3.3 V.
Page 33
CN3303 (A-6) : DEBUG terminal Not used. This terminal conforms to RS-232C. CN3901 (A-11) : IEEE1394 terminal Not used. This terminal conforms to IEEE1394. <TEST terminal> E1 (P-4), E2 (P-8), E3 (P-12), E4 (L-12), E5 (J-11), E6 (H-13), E7 (H-4), E8 (H-8), E9 (D-8), E10 (E-4) : GND terminal Use this terminal as the earth point for measuring the respective check terminals.
REF OUT EXIT REMOTE 4 REMOTE 3 TERMINAL DVS-9000-C Switcher Processor Pack Reference video signal *a : Connect each LAN (CTRL, DATA) to the separate Ethernet switches respectively. However, a single Ethernet switch can be used for connecting each LAN.
Page 35
REF IN DATA CTRL REMOTE 2 REMOTE 1 REF OUT EXIT REMOTE 4 REMOTE 3 TERMINAL DVS-9000-C Switcher Processor Pack 1-9. System Connection Monitor 100 to 240 V AC power supply Video input signal Video output signal AC power supply 1-27...
2-1. Troubleshooting The main power of the DVS-9000 cannot be turned on. (Indicator does not light green.) The main power of the DVS-9000 cannot be turned on. (Indicator does not light green.) Are the POWER switches A Set A and B both to ON. and B of the DVS-9000 both turned ON? Is the power cord of the...
This may have an adverse effect on performance and the life of the machine. Cleaning of the fan every month is recommended. Contact your local Sony Sales Office/Service Center for information on cleaning the fan. Fans (The illustration shows the DVS-9000.)
2-3. About the Data Backup Capacitor 2-3. About the Data Backup Capacitor A large capacitor is installed on the CA-44 board in order to backup the memory storing the setup and other data in the DVS-9000 series. Leave the main power of the DVS-9000 series turned on for one hour or longer in order to charge the large capaci- tor.
Page 41
The material contained in this manual consists of information that is the property of Sony Corporation. Sony Corporation expressly prohibits the duplication of any portion of this manual or the use thereof for any purpose other than the operation or maintenance of the equipment described in this manual without the express written permission of Sony Corporation.