Stuart Turner Monsoon Series Installation, Operation & Maintenance Instructions Manual page 17

Table of Contents

Advertisement

5.14 Starting:
a) Ensure all outlets are closed, turn power supply 'on' - pump will start,
pressurise the system then stop.
b) Open and close all outlets in turn associated with the pump, (including w/c
systems) allowing water to flow from each outlet until all air is purged. As
each outlet is opened and closed, the pump will start and stop respectively.
Note: After closing the outlet there will be a small time delay before the
pump stops, which is normal.
c) Any tap or control valve within the system when opened and closed will now
turn the pump on/off. Providing this is the case the system is now operating
correctly.
d) Carefully check pump and pipework for leaks whilst pump running and
stationary before leaving the installation unattended.
5.15 For Further Technical Support: Phone the Stuart Turner PumpAssist team
on +44 (0) 800 31 969 80. Our staff are trained to help and advise you over the
phone.
- 17 -
Cont ...

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents