Related Documents; Categorization By Frame Size And Option Code; Quick Installation And Start-Up Flowchart - ABB ACS800-17LC Hardware Manual

Drives (55 to 5200 kw)
Table of Contents

Advertisement

22
Technical data
sizes and technical requirements and provisions for fulfilling the requirements for CE
and other markings.
Dimensions

Related documents

See the

Categorization by frame size and option code

The instructions, technical data and dimensional drawings which concern only
certain drive frame sizes are marked with the symbol of the frame size (such as
"2×R8i+2×R8i", etc.). The frame size is not marked on the drive designation label. To
identify the frame size of your drive, see section
147.
The instructions and technical data which concern only certain optional selections
are marked with option codes eg, +E202.
The options included in the drive can be identified from the option codes visible on
the type designation label. The option selections are listed in section
designation key

Quick installation and start-up flowchart

Plan the installation.
Check the ambient conditions, ratings, required
external cooling arrangements, input power
connection, compatibility of the motor, motor
connection, and other technical data.
Select the cables.
Unpack and check the units.
Check the type code indicated by the type
designation label with the original order. If the drive is
about to be connected to an IT (ungrounded) system,
check that the drive is not equipped with EMC filtering
+E202. Check that all necessary optional modules
and equipment are present and correct.
Only intact units may be started up.
Check the installation site.
Introduction to the manual
contains the technical specifications of the drive eg, ratings, frame
contains information on the dimensions of the drive.
List of related manuals
on page 50.
Task
on the inside of the front cover.
Type equivalence table
Technical
Planning the electrical
Option manuals (if optional equipment is
included)
Mechanical
Hardware
For instructions on how to disconnect the EMC
filtering, contact your local ABB representative.
If the drive has been non-operational for more
than one year, the drive DC link capacitors
need to be reformed. Contact your local ABB
representative for more information.
Checking the installation
on page
Type
See
data, page
145
installation, page
installation, page
55
description, page
27
site, page
69
55

Advertisement

Table of Contents
loading

Table of Contents