Install Breakers And Fuses; Install Signal And Communications Cables; Install Rectifiers; Initial Start Up - GE SPS-48V Quick Start Manual

Slimline power shelf
Table of Contents

Advertisement

Document xxxxxxxxxx R01 2017 August
GE
Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure
Critical Power
Step 5 - Install Breakers and Fuses
Install breakers into positions as specified in Site Engineering
Instructions.
Use only breakers specified in the
max.
1. Remove Cover (2 thumb screws).
2. Verify that each Breaker is OFF.
3. Insert each Breaker fully into its position — oriented with ON position
at top.
4. Remove cover knockouts for installed positions.
5. Replace Cover (2 thumb screws).
6. Turn each Breaker ON.
7. Install each GMT style fuse fully into its position – oriented as shown – 15A max.
Step 6 - Set Jumpers - LAN Port and Relay per Galaxy Pulsar Edge Controller Quick Start Guide.
Step 7 - Install Controller per Galaxy Pulsar Edge Controller Quick Start Guide.
Step 8 - Install Signal and Communications Cables
1. J1-2Alarms and Inputs - Connect to office alarms and signals.
See
Information: Alarm Connections
2. J5 LAN - Connect to Ethernet network.
Step 10 - Install Rectifiers
Firmly push the rectifier into the rectifier slot.
Tighten the thumb screw until the rectifier is seated.
NOTE: When installing a rectifier in a powered system the RUN LED on the
rectifier will blink until communication with the controller is
established.
Step 11 - Initial Start Up
Verify that all AC, DC and Alarm connections are complete and secure. Turn on AC input breakers. If there are no
alarms, make required adjustments to the default settings on the controller for this installation.
SPS –48V Slimline Power Shelf
Quick Start Guide
Slimline Power System Brochure
for Details
SPS J200703 L005 – Quick Start Guide
Document 850052515 r02 2019 April