Honeywell IAQPoint2 Technical Manual page 23

Indoor air quality monitor
Hide thumbs Also See for IAQPoint2:
Table of Contents

Advertisement

connector
collar
gasket
O-ring
mounting
plate clamp
mounting plate
connector orientations
cross-sections in
horizontal ducts
air flow
air flow
Figure 19. Sampling tube and mounting plate
8� Rotate the sampling tube until the divider shown in the cross-section illustration
above is perpendicular to the flow of air in the duct�
9� Lightly lubricate the connector O-ring with water to facilitate installation�
10� Position the connector on the back of the monitor on the sampling tube
connector and twist a quarter-turn counter-clockwise� A tight fit is normal (the
O-ring on the sampling tube provides a snug seal with the monitor)� The monitor
will snap into position when it is securely attached to the sampling tube�
NOTE
!
The display does not auto-rotate� Mount the monitor so that
the display is right-side up and wires enter the two conduit
holes from the bottom�
11� Tighten the mounting plate clamp screws�
12� Conduit is attached to the bottom of the monitor in the same manner as
standard electrical junction boxes� Refer to the wiring illustrations on the
following pages for various configurations�
13� Install the terminal block cover�
gasket
sampling tube
cross-sections in
vertical ducts
air flow
air flow
IAQPoint2™
intake/
exhaust
21

Advertisement

Table of Contents
loading

Table of Contents