Parts List; Lifting Method; Installation Of Unit And Service Space; Installation - Mitsubishi Electric PAC-SV01PW-E Installation Manual

Solenoid valve kit
Table of Contents

Advertisement

Available languages

Available languages

3. Parts list

Package contents
This kit contains the following parts.
Parts name
Installation manual
Shape
Qty.
1
Attach the supplied specification label below the specification label on the PWFY unit to which the Solenoid valve kit will be connected.
Before attaching the specification label, wipe the surface clean with alcohol.
Use the supplied Liquid pipe and Gas pipe to adjust the piping height when installing the Solenoid valve kit on the same level with the PWFY unit.
List of field-supplied parts
• Refrigerant pipes other than the ones provided in the kit
• Heat-resistant insulation material (for field-supplied refrigerant pipes)
• Insulation cover tape

4. Lifting method

Caution:
Be very careful when carrying the product.
- Do not have only one person to carry product if it is more than 20 kg.
- PP bands are used to pack some products. Do not use them as a mean for transportation because they are dangerous.
- Tear plastic packaging bag and scrap it so that children cannot play with it. Otherwise plastic packaging bag may suffocate children to death.

5. Installation of unit and service space

5.1. Installation

• Using the anchoring holes shown below, firmly bolt the unit to the base.
[Fig. 5.1.1] (P.2)
A 4-ø14 (Anchoring hole)
B (Top view)
Bases
• Be sure to install unit in a place strong enough to withstand its weight. If the base
is unstable, reinforce with a concrete base.
• The unit must be anchored on a level surface. Use a level to check after installa-
tion.
• If the unit is installed near a room where noise is a problem, using an anti-vibration
stand on the base of the unit is recommended.

6. Refrigerant pipe and drain pipe specifications

To avoid dew drops, provide sufficient antisweating and insulating work to the refrig-
erant and drain pipes.
When using commercially available refrigerant pipes, be sure to wind commercially
available insulating material (with a heat-resisting temperature of more than 100 ˚C
1 Select the thickness of insulating material by pipe size.
Applicable models
Gas
Liquid
Drain
Insulating material's thickness
2 If the unit is used on the highest story of a building and under conditions of high
temperature and humidity, it is necessary to use pipe size and insulating mate-
rial's thickness more than those given in the table above.
6.1. Refrigerant pipe, drain pipe and filling port
[Fig. 6.1.1] (P.2)
A Refrigerant piping (gas)
C Drain outlet
E Left side view
6
Specification label
Liquid pipe
1
1
PWFY-P100VM-E1-AU
ø15.88
ø9.52
B Refrigerant piping (liquid)
D Front view
F Right side view
O.D. ø15.88 mm-
Gas pipe
I.D. ø19.05 mm
1
Warning:
• Be sure to install unit in a place strong enough to withstand its weight.
Any lack of strength may cause unit to fall down, resulting in a personal
injury.
• Have installation work in order to protect against earthquake.
Any installation deficiency may cause unit to fall down, resulting in a per-
sonal injury.

5.2. Service space

• Please allow for the following service spaces after installation.
(All servicing can be performed from the front of the unit)
[Fig. 5.2.1] (P.2)
Model
PAC-SV01PW-E
A Piping space (both sides)
C Service space (front side)
and thickness given below) onto both liquid and gas pipes.
Be also sure to wind commercially available insulating material (with a form polyeth-
ylene's specific gravity of 0.03 and thickness given below) onto all pipes which pass
through rooms.
PWFY-P200VM-E1-AU
ø19.05
ø9.52
ø32
More than 10 mm
3 If there are customer's specifications, simply follow them.
O.D. ø19.05 mm-
I.D. ø15.88 mm
1
1
a
b
c
150
210
600
B Top view
(Unit: mm)
d
400

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents