Contact And Site Information; Chassis And Network Information - Cisco MDS 9148T Hardware Installation Manual

32-gbps 48-port fibre channel switch
Hide thumbs Also See for MDS 9148T:
Table of Contents

Advertisement

Site Planning and Maintenance Records
Task No.
6
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
3. RFI = radio frequency interference.

Contact and Site Information

Use the following worksheet to record contact and site information:
Table 12: Contact and Site Information
Contact person
Contact phone
Contact E-Mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State
Zip code
Country

Chassis and Network Information

Use the following worksheet to record chassis and network information:
Planning Activity
Electromagnetic interference
(EMI) evaluation:
• Distance limitations for
signaling
• Site wiring
3
• RFI
levels
Cisco MDS 9148T 32-Gbps 48-Port Fibre Channel Switch Hardware Installation Guide
Verified By
Time
Contact and Site Information
Date
63