Installing The Carrier Rails - Fujitsu PRIMERGY CX400 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Basic hardware procedures

4.11.3 Installing the carrier rails

Ê Clarify the position of the system unit in the rack.
Ê Mark the position of the bottom edge of the server enclosure on the support
uprights.
Ê Identify the right and the left rail.
Figure 24: Attaching the left carrier rail
Figure 25: Adjusting the positioning clip
Ê Move the left carrier rail towards the rear side (2) while holding the
positioning clip (1). The mounting aid must lock in the corresponding hole.
64
Upgrade and Maintenance Manual
CX400 M4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents