System Installation; How To Load Ipl (Initial Program Loading; From Pc To Qt-2100 Terminal Via Rs-232C - Casio QT-2100 Installation & Down Recovery Manual

Versatile intelligent terminal
Hide thumbs Also See for QT-2100:
Table of Contents

Advertisement

System Installation

1. System installation
1-1.

How to load IPL (Initial Program Loading)

1-1-1.

From PC to QT-2100 terminal via RS-232C

IPL source
PC
IPL target
QT2100
I-6
In this chapter shows how to install QT-2100 systems and peripherals.
Normally, IPL is not necessary since QT-2100 has efficient program options to meet your
circumstances.
In some cases, you need to change the application program to meet your requirements, the
IPL is necessary to download the application program to QT-2100.
To load IPL, there are three methods:
1) From PC to QT-2100 terminal via RS-232C
2) From one QT-2100 terminal (master) to QT-2100 terminals (satellite) via inline
3) From CF card to QT-2100 terminal
COM
port
IPL Data
COM 1
1. Set up the system (refer to the left figure).
2. Initialize the target QT-2100 to receive the IPL data (refer to
the Machine initialization section of the Manager operation
chapter of QT-2100 Reference manual page 95).
3. Run the loading program of PC.
4. After IPL completion, continue to the initialize operation.

Advertisement

Table of Contents
loading

Table of Contents