Site Preparation Checklist
Task No.
2
3
4
5
Cisco MDS 9132T Fibre Channel Switch Hardware Installation Guide
74
Planning Activity
Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric
contamination
• Air flow
Power Evaluation:
• Input power type
1
• Power receptacles
• Receptacle proximity to
the equipment
• Dedicated circuit for
power supply
• Dedicated (separate)
circuits for redundant
power supplies
2
• UPS
for power failures
Grounding evaluation:
• Circuit breaker size
• CO ground (AC-
powered systems)
Cable and interface
equipment evaluation:
• Cable type
• Connector type
• Cable distance
limitations
• Interface equipment
(transceivers)
Site Planning and Maintenance Records
Verified By
Time
Date