Optical Budget Calculation For Res670 - Pdc Communication - ABB RES670 2.1 Commissioning Manual

Phasor measurement unit
Table of Contents

Advertisement

Section 9
Establishing connection and verifying the IEEE C37.118/1344 communication
9.6
78
IEC140000145 V1 EN
Figure 18:
Verifying the UDP communication using PMU Connection Tester
Now it should be possible to see the streaming synchrophasor data.
Verify the communication by following the same steps as in section
IEEE C37.118/1344 TCP
Optical budget calculation for RES670 - PDC
communication
Most of the times, the RES670 IEDs are located in the substations. A local PDC might be
located in the substation. For communications within the substation or between the
RES670 and the WAN/LAN access point, it is important to know what is the optical
budget available. The graph in Figure
– PDC configuration using typical OEMs.
communication.
19
shows the dynamic range available for a PMU
1MRK 511 366-UUS -
IEC140000145-1-en.vsd
Verifying the
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion670 seriesRelion 670 seriesRelion res670

Table of Contents