Disassembly/Assembly Procedures Of Deck Mechanism - Philips VR109/55 Service Manual

Table of Contents

Advertisement

www.freeservicemanuals.info
DISASSEMBLY/ASSEMBLY PROCEDURES
Main Mechanism
Before following the procedures described below, be sure to:
1. Remove the deck assembly from the cabinet.
(Refer to CABINET DISASSEMBLY INSTRUCTIONS on page 1-8-1.)
2. Remove Front Loading Assembly from main mechanism of the deck assembly. (See Fig. DM3)
All the following procedures, including those for adjustment and replacement of parts, should be done in Eject mode;
see the positions of [43] and [44] in Fig. DM1 on page 2-4-3. When reassembling, follow the steps in reverse order.
STEP
START-
/LOC.
ING
No.
No.
[0]
[0]
Joint Holder B
Front Loading Assembly
[1]
[0]
[2]
[2]
Cylinder Shield
[3]
[3]
Deck Grounding Plate
Cylinder Assembly
[4]
[2]
Loading Motor Assembly
[5]
[5]
[6]
[5]
Loading Motor Holder
[7]
[5]
AC Head Assembly
[8]
[8]
Tape Guide Assembly
[9]
[9]
Door Opener B
[10]
[9]
Pinch Arm (A) Assembly
[11]
[10]
Pinch Arm (B) Assembly
[12]
[8]
Capstan Motor
[13]
[13]
Cam Gear (B)
[14]
[14]
Center Pulley
[15]
[15]
M Lever Holder
[17]
[17]
Insulation Cap A
[18]
[17]
Mode Lever Holder A
[19]
[13]
Mode Lever A Assembly
Mode Gear
[20]
[18]
[21]
[13]
Cam Gear (A)
[22]
[20]
Pulley Assembly
[23]
[21]
Worm Holder
[24]
[23]
Insulator Cap B
[25]
[24]
First Post Assembly
[26]
[25]
FE Head
[27]
[26]
Prism
[28]
[12]
TG Post Assembly
[29]
[28]
M Brake T Assembly
[30]
[18]
M Brake S Assembly
06/28/2012
OF DECK MECHANISM
PART
Fig. No.
T
DM3
T
DM3
T
DM3
T
DM3
T
DM1, DM4
T
DM1, DM5
T
DM1, DM5
T
DM1, DM6
T
DM1, DM6
T
DM1, DM6
T
DM1, DM6
T
DM1, DM6
B
DM2, DM7
B
DM2, DM8
B
DM2, DM8
B
DM2, DM8
T
DM1, DM9
B
DM2, DM9
B
DM2, DM9
B
DM2, DM9
B
DM2, DM9
B
DM2, DM9
B
DM2, DM9
T
DM1, DM10 (S-15), *(P-5)
T
DM1, DM10 (S-16)
T
DM1, DM10 (S-17)
T
DM1, DM10 (S-18)
T
DM1, DM10 (S-19), *(L-4)
T
DM1, DM11 *(P-6)
T
DM1, DM11 *(L-5)
2-4-1
REMOVAL
REMOVE/*UNHOOK/
UNLOCK/RELEASE/
UNPLUG/DESOLDER
(S-1)
2(S-2),
Rec Arm
2(S-3)
(S-4)
3(S-5),
Two Connectors
(S-6), LDG Belt (B),
ACH Connector
AN(9P) and B(9P)
2(S-7), *(L-1)
2(S-8)
*(P-1), *(P-2), (C-1)
(S-9), *(L-2)
*(P-3)
E ring
3(S-10), Capstan Belt
(C-2)
(C-3)
(C-4)
(S-12)
(S-13)
*2(L-3)
(C-5), (W-1)
(S-14)
World of Free Manuals
INSTALLATION
ADJUSTMENT
CONDITION
(+) Refer to Alignment
Sec. Pg. 2-4-11
(+) Refer to Alignment
Sec. Pg. 2-4-10
H67T0DA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vr109/75

Table of Contents