Installing The Connecting Rods And Pistons - Yamaha FJR1300A(D) Service Manual

Table of Contents

Advertisement

e. Tighten the connecting rod nuts.
Refer to "INSTALLING THE CONNECTING
RODS AND PISTONS" on page 5-90.
f. Remove the connecting rod and big end
bearings.
Refer to "REMOVING THE CONNECTING
RODS AND PISTONS" on page 5-86.
g. Measure the compressed Plastigauge®
width "e" on the crankshaft pin.
If the crankshaft-pin-to-big-end-bearing
clearance is out of specification, select re-
placement big end bearings.
▲▲▲
▲ ▲▲▲
▲ ▲▲▲
2. Select:
• Big end bearings (P
TIP
• The numbers "A" stamped into the crankshaft
web and the numbers "B" on the connecting
rods are used to determine the replacement
big end bearing sizes.
• P
–P
refer to the bearings shown in the crank-
1
4
shaft illustration.
P
1
P
2
A
e
▲ ▲▲▲
▲ ▲▲▲
▲ ▲▲▲
–P
)
1
4
P
4
P
3
P
P
P
P
1
2
3
4
CONNECTING RODS AND PISTONS
B
For example, if the connecting rod P
crankshaft web P
spectively, then the bearing size for P
P
(connecting rod) - P
1
=
6 - 1 = 5 (yellow)
▲▲▲
EAS26170
INSTALLING THE CONNECTING RODS AND
PISTONS
The following procedure applies to all of the pis-
tons and connecting rods.
1. Install:
• Top ring "1"
• 2nd ring "2"
• Upper oil ring rail "3"
• Oil ring expander "4"
• Lower oil ring rail "5"
TIP
Be sure to install the piston rings so that the
manufacturer's marks face up.
2. Install:
• Piston "1"
(onto the respective connecting rod "2")
• Piston pin "3"
• Piston pin clips "4"
5-90
E
numbers are 6 and 1 re-
1
(crankshaft)
1
Bearing color code
1.Blue 2.Black 3.Brown 4.Green
5.Yellow 6.Pink
New
and the
1
is:
1

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents