Cabling The Gateway; Installing The Battery - Motorola SURFboard SVG2501 Series User Manual

Surfboard svg2501 series wireless voice gateway
Hide thumbs Also See for SURFboard SVG2501 Series:
Table of Contents

Advertisement

3
This product is for indoor use only. Do not route the telephone lines, USB
and/or Ethernet cable(s) outside of the building. Exposure of the cables to
lightning could create a safety hazard and damage the product.
Before starting the battery installation, see
information.
The battery is not intended for everyday use, only for power backup during a
power outage.
Install the battery before installing any other gateway components.

Installing the Battery

1. To remove the battery cover located on the bottom of the gateway, place the
gateway on its side with the LEDs facing up, press down on the upper two locking
tabs and then pull open the cover.
2. Line up the battery terminals and then slide the battery into the compartment until it
locks in place.
3. Set the battery cover into the bottom of the gateway and press down on the upper
two locking tabs, and then push the cover shut until the tabs snap into place.
Note: The battery may take up to 12 hours to reach a full charge.
Cabling the Gateway • Installing the Battery
SVG2501 Series Wireless Voice Gateway • User Guide
550885-001-a

Cabling the Gateway

Battery Safety Requirements
B
for
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Surfboard svg2501u

Table of Contents