Chapter 1
Table 1-1. Site Preparation Checklist (Continued)
Environment and Space Requirements
Must meet OSHA, local code, and HP specifications for safety and supportability (3 feet
minimum access in front and rear of electrical cabinets)
Side access of 24 inches improves cable routing and management
24 hour air conditioning (68 - 72 deg. F; 20 - 22 deg. C, 40 - 60% RH)
Table or work space big enough for console terminal and user guides
Bookshelf for documentation
Area to store equipment until time of installation
Ensure all equipment and/or shipping pallets can fit through doorways, hallways, and
into and out of elevators
Data & Voice Communications (Pre-Tested and Verified)
Voice phone located at system console terminal with cord long enough to reach all parts
of the rack installation
Phone line for remote support at each system
Ethernet, FDDI, Token Ring, or other standard
System Parameters
Hostname
IP address
Subnet Mask
Gateway IP Address
Gateway Host Name
DTC Node Name
Hardware Configuration, Cables, and so on
Availability of I/O paths and SCSI addresses for add-on devices
Availability of I/O backplane slots, memory slots, and so on
Valid, supportable configuration for added devices, interfaces, memory, and so forth
Correct type and length of cables, as specified in order documents

Site Preparation -- Circuit Breakers

When you connect the HP NetServer LXr 8500 to an AC power source, the server
temporarily draws a large "inrush current." This occurs even when the system is in
standby mode. Inrush current is much greater than the server's normal operating
needs. Generally, your external AC power source can handle the inrush current.
4
Preparation for Cabling the HP NetServer LXr8500