Introduction
1.1
Purpose of this document
These instructions contain all information required to commission and use the device.
Thoroughly read the instructions prior to installation and commissioning. To guarantee correct
handling, you should become acquainted with the principle of operation of the device.
The instructions are aimed at persons mechanically installing the device, connecting it
electronically, configuring the parameters and commissioning it, as well as service and
maintenance engineers.
1.2
History
The following table includes information on the different editions of this document.
Table 1-1
Edition
12/2014
05/2015
05/2022
1.3
Notes on warranty
The contents of this manual shall not become part of or modify any prior or existing agreement,
commitment or legal relationship. All obligations on the part of Siemens AG are contained in the
respective sales contract, which also contains the complete and solely applicable warranty
conditions. Any statements on the device versions described in the manual do not create new
warranties or modify the existing warranty.
The contents reflect the technical status at the time of printing. We reserve the right to make
technical changes in the course of further development.
1.4
Environmentally friendly use of resources
The device is characterized by an environmentally friendly use of resources during operation.
You can obtain detailed information, for example, on the gas consumption, from your Siemens
sales partner.
Field device
Operating Instructions, 05/2022, A5E35640463-07
Editions
Comment
First edition
Extended commissioning
Supplements incorporated and spare parts order updated
1
7