Charge the system using the weight method.
The unit comes with enough charge for 25 feet per circuit.
For example, the 2 port unit will come with 50 feet of charge,
the 3 port unit will come with 75 feet of charge, and the 4
port unit will come with 100 feet of charge. If the system
must have additional charge added, add .2 ounces of charge
for every additional foot of refrigerant line that is above
factory charge. If the total of distance of the installed line
sets is below factory charge, the factory charge is sufficient.
Simply release the charge by opening the system service
valves.
Check Items for Test Run
Put check mark
in boxes
‡ No gas leak from linesets?
‡ Are the linesets insulated properly?
‡ Are the connecting wirings of indoor and outdoor firmly
inserted to the terminal block?
‡ Is the wiring of indoor and outdoor firmly fixed?
‡ Is condensate draining correctly?
‡ Is the ground wire secure? Is the indoor unit secured?
‡ Is power source voltage correct according to local code?
‡ Is there any noise?
‡ Is the lamp normally lighting?
‡ Are cooling and heating performing normally?
‡ Is the operation of room temperature sensor normal?
• Using the OPERATING INSTRUCTIONS, explain to the user how to use the air conditioner (the remote controller, removing
the air filters, placing or removing the remote controller from the remote controller holder, cleaning methods, precautions for
operation, etc.)
• Recommend that the user read the OPERATING INSTRUCTIONS carefully.
PAGE 12

Step 6 - Charging

Step 7 - System Test

Step 8 - Explaining Operation to the End User