Step 6 - Charging; 5Hiuljhudqw &Kdujh /Deho; System Test; Khfn ,Whpv Iru 7Hvw 5Xq - Haier AW09TE1VHA Service Manual

Ductless split heat pump
Table of Contents

Advertisement

piping hole. Use a sealant to seal the piping hole opening
to prevent weather elements from entering the building.
(Illustration 6)
Verify the condensate drain line has a constant pitch
resulting in the failure of the condensate to exit the piping.
See Steps 5.2 - 5.5 for evacuating the system prior to
charging. The standard lineset length is 25ft. If the installation
for the 9K, 12K, 18K, and 24K model. (Step 4 - Illustration 4)
Refrigerant Charge Label
by the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type: R410A
GWP* value: 1975
GWP = global warming potential
label supplied with the product.
product charging port (e.g. onto the inside of the stop valve
cover).
Kyoto Protocol
B - factory refrigerant charge of the product: see unit name
plate
D - total refrigerant charge
E - outdoor unit
F - refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
R410A
2
1
F
E

Step 6 - Charging

0.2
A
1=
oz
B
2=
oz
C
1+2=
oz
D
INSTALLATION
It becomes
The end is imm-
It waves.
high midway.
ersed in water.
Illustration 6

System Test

Please kindly explain to our customers how to operate
through the instruction manual.
Check Items for Test Run
Put check mark
in boxes
No gas leak from linesets?
Are the linesets insulated properly?
inserted to the terminal block?
Is condensate draining correctly?
Is the ground wire securely connected? Is the indoor unit
Is power source voltage correct according to local code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performing
normally?
Is the operation of room temperature sensor normal?
Less than
5cm
There is the bad
The gap with the
ground is too small
smell from a sewer
39
PAGE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents