Chapter 4 Setup
>
4.2 Cable Connection
Procedure
1
2
2-1
2-2
P3AM-3042-03ENZ0
ETERNUS DX60/DX80 Disk storage system User Guide
Remove the connector cover of Fibre Channel port.
Remove the connector cover attached to the Fibre Channel port of the controller 0 (CM#0)
or controller 1 (CM#1).
Connector cover
Keep the removed connector cover in a safe place where they will
IMPORTANT
not be lost.
Connect the Fibre Channel cable to the ETERNUS DX60/DX80.
Remove the covers from the Fibre Channel cable connectors.
Insert the Fibre Channel cable connectors in the controller 0 (CM#0) and controller 1
(CM#1) Fibre Channel ports.
If only one Fibre Channel port is to be used, it should be port 0 on each CM.
89
Copyright 2009 FUJITSU LIMITED