Led Indicators And Push Buttons - Panasonic MEW01091 Operating Instructions Manual

Fire alarm system
Table of Contents

Advertisement

Panasonic Electric Works Nordic AB
MEW01091
Rev: 3
5
LED indicators on the Fire Brigade Panel (FBP)
LED indicator
L1
Fire (5 red)
Blinking (0.4/0.4s)
L2
Alarms queued (2 red)
Blinking (0.4/0.4s)
L3
Extinguishing (red)
L4
Ventilation (yellow)
L5
Fire brigade tx (red)
L6
Operation (green)

LED indicators and push buttons

LEDs and push buttons can vary according to configuration /
convention / country / language.
See also Figure 2, page 12.
Indicating
Fire alarm (also pre-warning, heavy smoke/heat alarm & key
3
cabinet alarm)
More than one unit / zone have generated fire alarm.
Output(s) activated for extinguishing equipment.
Output(s) activated for fire/smoke ventilation equipment.
Output activated for Fire brigade tx (routing equipment)
and/or corresponding programmable output(s) of type routing
4
equipment.
Test of routing equipment in progress (see menu H1).
Power on, i.e. EBL128 is power supplied via the rectifier or
the backup battery.
(FBP push buttons on next page)
3
In the New Zealand convention also "Acknowledged alarm" (ACK).
4
L3 and L5 can
as an alternative
programmable input is activated,
system released" and "Activated routing equipment" respectively
be turned on when a programmable input is activated by
equipment
output).
L5 is turned on until all fire alarms are reset.
14
EBL128 Operating Instructions V1.1.x
be programmed to indicate when a
i.e. input trigger condition "Extinguishing
an activated routing
4
(e.g. L5 can

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ebl128

Table of Contents