Cabling Warnings And Cautions; Unterminated Power Cords Require Licensed Electrician - HP D7171A - NetServer - LPr Manual

Rack cabling reference
Hide thumbs Also See for D7171A - NetServer - LPr:
Table of Contents

Advertisement

Chapter 1
Create a cable management loop by providing sufficient cable length to
allow servers to be extended from the rack for maintenance.
Attach data cables to their respective components.
Attach power cables
Connect each component to a Power Distribution Unit (PDU) or Units.
Connect PDU and Uninterruptible Power Supply (UPS)--if present--cables
to Branch Circuits.
Route and tie cables
Route cables through cable guide and tie wrap them in place.
Power on the components in the rack.
Follow the power up sequence. See "Power Up Sequence" in Chapter 2.
7. Configure the System, Install Doors and Side Panels
At this point, refer to the NetServer user or installation manual and configure the
system.
Install front and rear doors as required, and mount side panels. Follow the
detailed instructions and illustrations that are included with the rack enclosure
and components.

Cabling Warnings and Cautions

Unterminated Power Cords Require Licensed Electrician

In some cases in the 230/240V environment, the Uninterruptible Power Supply
(UPS) is shipped with a power cord that is unterminated. The reason is that the
current demand of a fully loaded rack may exceed the demand for the normal
circuit in some countries. Therefore, you should have a qualified electrician or
electrical engineer analyze the current demand for each branch circuit used by
rack mounted equipment. Proper wiring and cord termination are part of the
same process.
8
About This Cabling Reference

Advertisement

Table of Contents
loading

Table of Contents