Installation Steps - Haier HHS-1X5K User Manual

Battery energy storage system
Table of Contents

Advertisement

Cable kit Packaging Components
Positive wire harness
X1

3.3 Installation steps

a. Place the base
Take the control module and base module out of the carton and put them side by side.
The base module should be placed on a level
ground, parallel to the wall. The clearance to the wall should be 35mm (1.4inches).
b. Install the angle bracket
Fixing screw
Angle bracket
Negative wire harness
X1
M5*12
-
PCS-RS485/CAN
communication cable X1
4 pcs
2 pcs
10
120ohm resistance
()
35mm (1.4inches)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hhs-1x10kHhs-1x15kHhs-1x20k

Table of Contents