Average Task Duration - Fujitsu PRIMERGY RX2540 M7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

CAUTION
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians
trained by Fujitsu. Please note that unauthorized interference with the
system will void the warranty and exempt the manufacturer from all
liability.
Components that are handled as Field Replaceable Units
– Common Operation Panel (COP)
– CPU (replacement)
– HDD backplane (SAS/SATA/PCIe SSD)
– PCIe riser card
– System board
– Trusted Platform Module (TPM)
– Thermal sensor
– Liquid cooling (LC) kit
Please ask your local Fujitsu service center for more information.
2.3

Average task duration

Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
RX2540 M7
Upgrade and Maintenance Manual
Before you start
27

Advertisement

Table of Contents
loading

Table of Contents