Optional) Power-Off; Checking After Commissioning - Huawei NetCol8000-C190 User Manual

In-room chilled water smart cooling product
Hide thumbs Also See for NetCol8000-C190:
Table of Contents

Advertisement

NetCol8000-C190 In-room Chilled Water Smart
Cooling Product
User Manual (2022, Singapore STT)
----End

4.8 (Optional) Power-Off

Context
In shutdown mode, the shutdown button is green (unavailable) and the start
button is gray (available).
Procedure
Step 1 Tap Shutdown on the home screen of the display module. A dialog box is
displayed, indicating whether to shut down the smart cooling product, as shown in
Figure
Figure 4-22 Shutdown
Step 2 Tap Confirm. If the device is successfully shut down, the system displays a
message, indicating that the command is successfully triggered.
Step 3 Turn off the active power switch QF1 and standby power switch QF2.
Step 4 (Optional) If the power supply needs to be disconnected for maintenance or for a
long period, turn off the smart cooling product switch in the power distribution
frame (PDF).
----End

4.9 Checking After Commissioning

Table 4-10
Issue 02 (2022-03-30)
NO TE
If commissioning fails, tap Commissioning failed to view the details.
4-22.
lists the commissioning checklist.
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol8000-c190d40edNetcol8000-c190d40ec

Table of Contents